Shuksan Middle School
- Client: Bellingham School District
- Location: Bellingham, WA
- Completed: March 2010
- Architect: Zervas Group Architects
Description
This 82,000 sq. ft. structural steel with combined concrete tilt-up construction was built on the play fields of the existing school while regular school classes continued. The thoughtful construction and design of the facility promotes community and provides a positive space for education.
Features
- Cranes used onsite for tilt-up construction
- Sizable two-story gymnasium